The Engineering Department coordinates, reviews, and approves all private-funded public improvements initiated by the development community, from design through construction to completion. The Engineering Team works closely with the Planning and Building Teams to accomplish this task.

In addition, the Engineering Team reviews and manages many of the City's capital improvement projects. The Department's Public Improvements Inspector inspects all water line installation and work that occurs within the public right-of-way.

 

Park City Supplemental Standards and Specifications

The City has adopted the American Public Works Association (APWA) Standard Specifications and Plans as the standards for all construction and improvements in the public right-of-way. The Engineering Team additionally maintains and updat the City Supplemental Standards and Specifications to be used in conjunction with the APWA standards.

Park City 2024 Supplemental Standards and Specifications

 

TRAFFIC IMPACT STUDY GUIDELINES

The Traffic Impact Study Guidelines provide a framework for when a transportation impact study may be required for new land use developments or redevelopments in Park City. The required contents of the transportation impact study are also provided in these guidelines. 

Traffic Impact Study Guidelines

TO REPORT SIDEWALK, CURB & GUTTER, DRAINAGE AND/OR CONSTRUCTION ISSUES PLEASE CONTACT THE PUBLIC IMPROVEMENTS INSPECTOR @ 435-615-5071. IF AFTER HOURS OR AN EMERGENCY PLEASE CONTACT POLICE DISPATCH AT 435-615-5500.

THANK YOU FOR YOUR TIME AND EFFORT IN KEEPING PARK CITY BEAUTIFUL AND SAFE.

List of Private and Public Roads




Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer

Current Engineering RFP's

IFB: Multi-Project Roadway Construction

  • Department:Engineering, Public Works, BPE - Building / Planning / Engineering, Community Development
  • Category:Current RFP's and Bids
  • RFP Number:PCMC25115-ENG
  • Start Date:03/12/2025
  • Close Date:03/27/2025 3:00 PM

Single Solicitation, Multiple Contract Award for:

  • CP0527 – Homestake Road Reconstruction
  • CP0576 – Ability Way Roadway Improvements

Bids are due March 27, 2025 at 3:00 p.m.  Bids must be submitted on Bonfire.

Single Solicitation Multiple Award for CP0527 Homestake Rd & CP0576 Ability Way


Return to full list >>

Interested in receiving or changing Park City notifications?